yazilimweb tasarim

Project Description

  •  Site  clearance and heavy bush clearing
  •  Earthworks (removal of black cotton soil, Rockfill, Fills,Improved subgrade)
  •  Stabilized GCS  for subbase works
  •  Stabilized  GCS for base works
  •  Asphalt concrete on the carriage way
  •  Installation of street lights
  •  Storm water drainage ( Concrete Lined drains)
  •  Construction  of trunk sewer
  •  Installation of kerbs and channels
Back to Top

Phone: + 254 709 794 000